PéPark Kft.
greening motorways
services
introduction
PéPark Kft. was established as the successor of the former Parképítő Zrt., with the involvement of colleagues with decades of experience and expertise. Since 2014, our company has been involved in motorway greening, i.e. planting, grassing and aftercare along motorways and expressways. As our references show, we carry out the work we do in many parts of the country. We are happy to contribute our expertise and enthusiasm to the successful implementation of road projects.
Our major clients:
Aszfalt Hungária Kft.
Belfry PE Kft.
Bell-Invest Kft.
Betonútépítő Zrt.
COLAS Hungária Zrt.
COLAS Út Zrt.
Euroaszfalt Kft.
Hazai Építőgép Társulás Zrt.
HE-DO Kft.
HSP Hídépítő Speciál Építőipari Kft.
Belfry PE Kft.
Bell-Invest Kft.
Betonútépítő Zrt.
COLAS Hungária Zrt.
COLAS Út Zrt.
Euroaszfalt Kft.
Hazai Építőgép Társulás Zrt.
HE-DO Kft.
HSP Hídépítő Speciál Építőipari Kft.
KM Építő Kft.
LAVINAMIX Építő Kft.
Magyar Közút Nonprofit Zrt.
Penta Kft.
REC-PLUS Kft.
Strabag Építő Kft.
SZABADICS Közmű- és Mélyépítő Zrt.
Vakond Via Kft.
LAVINAMIX Építő Kft.
Magyar Közút Nonprofit Zrt.
Penta Kft.
REC-PLUS Kft.
Strabag Építő Kft.
SZABADICS Közmű- és Mélyépítő Zrt.
Vakond Via Kft.
references
- Complete implementation of planting works necessary for the construction of the connecting road between Páty and the M1 interchange
- Szeged, ELI Laser Center transportation connectivity improvement project, planting works
- Modernization of urban economic roads in Szeged – Planting works on Városgazda Street
- The planting works of the Budapest – Balaton cycling route section between Etyek and Tordas
- The comprehensive implementation of planting and post-care tasks on the site of the planned waste management center in Adony, on the site of the planned waste management center in Székesfehérvár, and on the territory of 7 planned waste yards
- Construction of the Daunaalmás section of the Eurovelo 6 bicycle route, planting works within the framework of the project
- Budapest – Balaton bicycle route – planting works on the section between Budapest and Etyek
- Érd, landscaping and grassing works of the section between the shafts of the Danube inlet of the cleaned water pressure pipeline and the connection to the flood plain
- Grassland planting and maintenance works for the project Improvement of flood protection safety in the flood protection bay of Komárom, Almásfüzitő
- Grassing works for the project to improve flood safety in the Marcal right bank flood protection sub-basin
- M85 Enese-Csorna road section between 13+800-20+800 km, grassing and planting works
- M86 motorway section between Szeleste and Hegyfalu (98+300-105+800 km): biological protection, grassing and planting works
- M86 motorway section between Hegyfalu-Csorna (105+800-119+200 km): biological protection, grassing and planting works
- Tree felling, scrub clearance and brush clearance works related to the construction works of a twin axle weight measuring station at the Lajta rest area on section 158 km of the M1 motorway
- Tree planting works at the Martonvásár site of Aszfalt Hungária Kft.
- Main road No 21, section II, between 23+300-27+820 km, clearing and grubbing works
- Planting and aftercare works within the framework of the M3 motorway junction project for providing access to Mogyoród and Fót
- Implementation of grassing and planting works following the construction works of the Arany brook and the Dozmati reservoir, with aftercare
- Implementation of shrub planting works for the roundabout in section 2+260 km as part of the road reconstruction works between section 1+565-6+362 km of the Csepel – Szigethalom access road 51101
- Planting and aftercare works on the M25 motorway South (section 7+073.80 – 14+617.88 km), Maklár junction and Maklár access
- Planting and aftercare works on the M30 motorway Miskolc-Tornyosnémeti B construction section (53+000-59+000 km)
- Planting and aftercare works on the M85 expressway section between Fertőd-Endrédmajor junction-Nagylózs (51+600-67+200 km)
- Rába valley project, within the framework of the project for the construction of flood protection in the area, grassing works
- Planting of sub-tasks and aftercare within the framework of the Poroszló – Tiszafüred cycle path project
- Planting and aftercare works on the M30 motorway Miskolc-Tornyosnémeti A construction section (30+100-35+200 km)
- Planting, grassing and after-care works in the framework of the projects Százhalombatta (excl.) – Ercsi junction (incl.) and Ercsi junction (excl.) – Pusztaszabolcs (closed) in the framework of the modernisation of the railway track and related facilities
Reference works implemented under the auspices of Parképítő, our former Company:
Weed control, gap protection works
- Grassing works on the M30 motorway
- Grassing works on the section of the M5 motorway between Kecskemét and Kiskunfélegyháza
- Gap protection works on the M6 Motorway
Planting, grassing
- M7 Motorway
- M0-Motorway, 0-28.8 km section
- M1 Motorway, sections between Törökbálint-Bicske and Tatabánya-Győr
- M3 Motorway, sections between Gyöngyös-Füzesabony and Füzesabony-Polgár
- M70 Highway
- M9 Highway
Park building
- Budapest, Aréna Plaza
- Budapest, Campona shopping mall
- Budapest/Albertfalva Savoya-park (Auchan, OBI)
contact
PéPark Parképítő és Kertészeti Kft.
Address: 2890 Tata, Környei u. 24.
Phone: 06 30 378-7846
e-mail: | peparkkft@gmail.com |
csaba.pinter@pepark.hu | |
web: | www.pepark.hu |